Gyprock 98% complete …

Hi all,

Since the last post, I have completed nearly all the gyprocking, except for the section across the roller door and two of the brick sections. The roller door will be left for a while, as I need to get rid of some cupboards and shelving units that are now too tall and cannot fit in the room with the proposed layout plan. The roller door will be the easiest method of extricating these items, as once it is framed over, the only access will be up the stairs into the house, and I’m not dragging them up the stairs!!

Hopefully over the next couple of weeks, I’ll complete the setting of all the joins and maybe even give the walls a coat of paint. This won’t be anything flash, as the walls won’t be seen once the layout get built.

Then it will be time to get the workbench back in position ready for some long awaited modelling to recommence.

The next major job will be to install the suspended ceiling.

Hoo roo for now.

Ian

Advertisements

Posted on December 27, 2010, in Room Construction and tagged . Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: