Chilcott’s Creek bridge assembly – Part V …

Hi all,

I have recently been redoing the weathering on the Chilcott’s Ck bridge abutments and piers. I wasn’t happy with my first attempt using the acrylic crayon powders quite a while ago.  So, this time using oil paints, I applied an all over light grey colour using a stippling brush and I think it has produced a neat effect.  Then using other colours like black, white and more grey, I have again stippled over the top for a random effect.  For the rust staining, I used the oils again but washed them down with turps.  Again pretty happy with the results so far.

abutment weathering take 2

abutment weathering take 2

 

I have also finished the “base” grey coat on the piers and will let that dry before moving onto the rust staining.

pier weathering take 2

 

I have also made some more progress on the Chilcott’s Ck bridge scene over the last few days.  A slight change of plans to what I mentioned previously, in that I have decided to fix the timber sub-module base in place then add the scenery foam around and on top of it.  The abutments will then be fixed in place, along with the piers.  Scenery including dirts and grasses will then be applied, and hopefully some ‘water’ in the creek!  The bridge span will then be fixed in place once all this has been completed.  Pictures show all the foam pieces and the sub-module base temporarily in place.

A plywood base was fixed in place to provide support for the foam.

plywood base and sub-module in place

 

With the bridge sub-module sitting in place, a jigsaw of various pieces of foam were cut to fit.  First off were two pieces front and back to continue the creek bed, which was drawn in and then routed out to the same depth as on the timber sub-module.

creek bed foam in place

 

Then other pieces of foam were cut and shaped to fit the previously made pieces under the bridge.

 

The last two pictures show the bridge span and piers temporarily in place to give an idea of how the scene will look.  Final shaping of the foam will be done when the pieces are fixed down.

Cheers.

Advertisements

Posted on June 11, 2016, in Chilcott's Ck, Scenery, Weathering and tagged , , . Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: