Kankool frame installation – Part IV …

Hi all,

Yesterday I completed the final wire-in-tube terminations from the Kankool frame.

The runs to signals 15,17 & 18 had been left until last as I had to work out how I was going to operate the three arms.

Due to the hardware that is used when terminating the tube runs, and the space it requires, I had to come up with a different method for the three arms.  A block was mounted under the spline for signals 15 & 18, but a separate one was required for signal 17.  This also made it necessary to reverse the direction of throw for signal 17 from a “pull” to a “push”, so I fabricated a small crank.

So, as mentioned, this completes all wire-in-tube runs from the frame to all turnouts and signals.

I have also constructed a timber surround for the frame to not only conceal the frame workings, but to simulate the floor of a signal box.

This needed to be made removable to allow future access to the locking bed for maintenance purposes.  The surround is removed by sliding it away from the fascia.

As this will probably be my last post for 2016, I hope everyone has a Merry Xmas and Happy New Year!

Cheers.

Advertisements

Posted on December 25, 2016, in Kankool, Signalling and tagged , , , . Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: