Hi all,

Well, it’s been quite a while since my last post, and since then, quite a bit has been achieved.

I have now got CV track and rail laid from the Sydney end of Kankool up to the approximate location of the Up Home signal at Ardglen, which is shown by the red line in the image below.  A total length of around 38 metres (125 feet).  This was achieved over about a six week period.

I continued with the rail laying process as described previously here.

Work has also commenced on the first of the Ardglen turnouts at the Kankool end.

During the last few months, I also spent some time finishing up the weathering on three more 45 class locomotives and the fitting of Loksound Select DCC decoders and sugar cube speakers.

45_class_decoder_installs

I fabricated my own speaker enclosures to fit two 8 ohm, 11 x 15mm ‘sugar cube’ speakers, wired in parallel.

Below are some shots of the weathering on the 45’s.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cheers.

Advertisements

Spline now 80% complete …

Hi all,

Over the last few months, I have completed all spline work within the Ardglen area, including the ballast sidings, and also to a point about halfway between Ardglen and Pangela.

This now means I have completed construction of 80% of total spline, which equates to 292 feet (88.5 metres) with just 74 feet (22.5 metres) of spline left to build through Pangela and to connect up to the helix.

The two images below are views of Ardglen from either end, showing the storage and goods sidings.

Ardglen spline (tunnel end)

Ardglen spline looking towards tunnel

 

 

 

 

 

 

 

 

 

 

The next image is a shot further down the grade from Ardglen, looking back towards the ballast sidings coming off the quarry road.

Ardglen spline with ballast sidings

 

The next image shows the shunting neck at the end of the quarry road.

Ardglen spline with quarry road shunting neck

 

The next image shows a general view of the section above Temple Court.  I have yet to finalise setting the grade in this section.  Temple Court has been covered with drop sheets to protect the scenery from dust and dirt whilst working above.

 

The next series of images show the spline from Ardglen tunnel through to a point about halfway to Pangela.

Cheers.

Layout progress update …

Hi all,

Apologies for the lack of updates since early Dec last year.  I have been busy with some scenery in the Temple Court section as well as some more benchwork and spline construction.

Temple Court scenery

I’ve made a start on some static grass application but have not done much since Christmas.  It’s been tricky getting the look and colours right, but I think it will look OK as it progresses.

Some pics below of the progress so far.

Temple Court scenery

Temple Court scenery

Temple Court scenery

I still haven’t done any more with the rocky outcrop, but you can see lots of plaster castings sitting around for inspiration.

 

Lower level backscene, upper deck benchwork and spline

I also started installing the backscene from staging through Kankool, including the entry from staging onto the Chilcott’s Ck bridge scene.

Backscene at Chilcott's Ck bridge scene

Backscene & upper deck benchwork at Kankool

Backscene & upper deck benchwork at Kankool

The last picture above shows the new supports installed for the upper deck above Kankool as well for backscene support.  As mentioned previously, I am using 3mm MDF as the backscene and this will be painted with the sky colour.

I had always planned to work on the lower deck scenery and trackwork from Chilcott’s Ck bridge to Ardglen first before the upper deck, mainly due to thinking I would have access issues on the lower deck for scenery work if I built the upper deck benchwork.  In the last few weeks I have since decided to progress with upper deck benchwork, spline and scenery from Ardglen through to Pangela as the next stage.

This all came about after I had started to think about getting the bridge in place and laying track from staging through Kankool.  But I realised that this may not be such a good idea as once the bridge was installed, and I had scenery in place, I would be working above all this with the ever present danger of things falling on the scene below.

So, the decision was made to continue with upper deck benchwork above Kankool and around to Pangela as well with spline construction from Ardglen to Pangela.

As I had already built the benchwork for Ardglen and the section above Chilcott’s Ck to Kankool some time ago (see previous post), I started to lay out the spline in this area.

Ardglen spline construction

Upper deck spline

As mentioned above, the plan is to continue with upper deck benchwork all the way from Kankool through Pangela and to build the spline from Ardglen to Pangela, then start on basic scenery formation.  Once all the messy stuff with plaster is done on the upper deck, I’ll probably then look at getting the Chilcott’s Ck bridge installed and continuing with scenery through Kankool and beyond towards Ardglen.

Cheers for now.

Cab ride …

Hi all,

Back in 2013, a mate who is a driver for Pacific National, took some video for me of a trip over the area I am modelling.

Enjoy.