Upper deck progress …

Hi all,

Since my last post, I have been busy with work on the upper deck above the Chilcott’s Ck to Kankool section.

To support the upper deck valance and future lighting, steel brackets were fabricated from second hand 20x20mm square tube, along with bracing made from thin steel plate.

A simple timber jig was made to hold the pieces of tube in place whilst the brace plate was attached using pop rivets.

support brackets

support brackets

 

 

 

 

 

 

These brackets were then screwed to the wall at strategic locations at wall studs.

After the initial installation of these brackets, I discovered a potential flaw in my design.  The two rivets fixing the brace plate to the vertical tube were shearing off with only minimal downward force being exerted at the outer end of the horizontal tube.  Now, I’m not sure whether it was actual rivet failure or what, so I decided to replace these rivets with a 3/16” bolt/spring washer/nut combination.  The result is a much stronger feeling bracket.

 

I had also decided to install a ceiling above each scene, as I didn’t fancy the idea of being able to see the open benchwork when looking along the scene from one end.  Once painted, I also think it will assist in spreading the light onto the scene.

The ceiling is made from sheets of 3.2mm MDF (2440x1220mm).  This required the installation of a timber sub-frame built around the steel brackets to allow for the securing of the ceiling.  2×1 DAR pine was used.

upper deck ceiling frame

upper deck ceiling frame

 

More framing was also installed in the corner to support the backscene and ceiling.

corner framing

 

A ceiling section was cut to size from the MDF and secured to the timber frame using Liquid Nails and small gauge countersunk screws.  The adhesive was also applied to the steel tube.  Temporary supports were used to hold the ceiling in place whilst fixing the screws.  After the screws were installed, extra temporary supports were fitted to force the ceiling against the steel tube whilst the adhesive cured.

ceiling in place with temporary supports

ceiling in place with temporary supports

 

 

 

 

 

 

 

The ceiling section in the corner proved to be quite tricky to cut to size, but by using accurate measurements, I ended up with a piece that fitted perfectly.

layout_construction_250

 

A couple more sections of backscene was also installed, including the piece in the corner.

more backscene

These sections of backscene have no need to extend completely down to the benchwork, as the track level will be around where the lower edge of the MDF is in the picture above, and the majority of scenery here behind the track will be hills covered with trees.

I also started playing around with how I will locate the Kankool lever frame into the fascia.  The picture below shows a mock-up of what I hope to achieve.

Kankool frame placement

The MDF immediately behind the frame will be the scene fascia and the curved piece in front is to indicate another section of fascia that will serve as ‘protection’ for the frame.  More on this later.

Cheers.

Advertisements

Layout progress update …

Hi all,

Apologies for the lack of updates since early Dec last year.  I have been busy with some scenery in the Temple Court section as well as some more benchwork and spline construction.

Temple Court scenery

I’ve made a start on some static grass application but have not done much since Christmas.  It’s been tricky getting the look and colours right, but I think it will look OK as it progresses.

Some pics below of the progress so far.

Temple Court scenery

Temple Court scenery

Temple Court scenery

I still haven’t done any more with the rocky outcrop, but you can see lots of plaster castings sitting around for inspiration.

 

Lower level backscene, upper deck benchwork and spline

I also started installing the backscene from staging through Kankool, including the entry from staging onto the Chilcott’s Ck bridge scene.

Backscene at Chilcott's Ck bridge scene

Backscene & upper deck benchwork at Kankool

Backscene & upper deck benchwork at Kankool

The last picture above shows the new supports installed for the upper deck above Kankool as well for backscene support.  As mentioned previously, I am using 3mm MDF as the backscene and this will be painted with the sky colour.

I had always planned to work on the lower deck scenery and trackwork from Chilcott’s Ck bridge to Ardglen first before the upper deck, mainly due to thinking I would have access issues on the lower deck for scenery work if I built the upper deck benchwork.  In the last few weeks I have since decided to progress with upper deck benchwork, spline and scenery from Ardglen through to Pangela as the next stage.

This all came about after I had started to think about getting the bridge in place and laying track from staging through Kankool.  But I realised that this may not be such a good idea as once the bridge was installed, and I had scenery in place, I would be working above all this with the ever present danger of things falling on the scene below.

So, the decision was made to continue with upper deck benchwork above Kankool and around to Pangela as well with spline construction from Ardglen to Pangela.

As I had already built the benchwork for Ardglen and the section above Chilcott’s Ck to Kankool some time ago (see previous post), I started to lay out the spline in this area.

Ardglen spline construction

Upper deck spline

As mentioned above, the plan is to continue with upper deck benchwork all the way from Kankool through Pangela and to build the spline from Ardglen to Pangela, then start on basic scenery formation.  Once all the messy stuff with plaster is done on the upper deck, I’ll probably then look at getting the Chilcott’s Ck bridge installed and continuing with scenery through Kankool and beyond towards Ardglen.

Cheers for now.

Work continues on Temple Court section …

Hi all,

Since my last post on Temple Court, I have been busy continuing with benchwork for the backdrop in this section as well as installing some upper deck supports.

I also added extra bracing back to the walls to strengthen the whole thing.

upper deck support bracing

I have had to do quite a lot of thinking about the deck separation and depth of scenes around Temple Court, as, for me to continue with spline construction up into Ardglen, I needed to have some supports in place.  This meant working out a bracket design that would support the spline and scenery, as well as maximising deck separation below to Temple Court.

I always had the idea of making the upper deck brackets out of 20mm square steel tube, mainly to maximise deck separation, but also because I had heaps of the stuff left over from an old balustrade system from around our outdoor deck.

steel tube upper deck support

As it turns out, at least in this section, I decided to use only a few steel brackets, as I could see issues with fixing future timber risers to the steel tube.  Anyway, these ones will be a test for future supports under Pangela.

I ended up making the rest of the supports from 2×1 DAR pine screwed together in an inverted L shape.  A 6mm ply brace was also glued and screwed to these supports.

upper deck roadbed supportplywood brace

 

 

 

 

 

 

These supports are placed at roughly the elevation of the spline at each location.  I was going to make them exactly at the elevation, but thought it wouldn’t leave any room for adjustment to the correct height.  This will be achieved with timber shims.  The supports are just long enough so the spline will be attached close to the end.  Another piece of 2×1 will be attached later to extend out for the fascia support.  This design was done to ensure maximum scenery depth below track level but also to maintain maximum deck separation.

I wasn’t concerned about the angled brace being high at the back, as in this part of the upper deck scene, there will be hills pretty much the full height of the backdrop.

 

 

 

 

 

 

 

The above two photos show the section ready for backdrop installation.  I have chosen to use 3mm MDF.  In this section, the backdrop is about 400mm high, so out of a 2440 x 1220mm sheet, I was able to get three sections of backdrop for the full length of this scene.  Prior to installing the MDF, the rear of each sheet was painted in an undercoat to seal the MDF, so as to prevent any possible ingress of moisture.  I was unsure whether I would have to worry about it, but better to do it now than later.

 

Entry/exit from Down Staging

Entry/exit from helix

 

 

 

 

 

 

The above two pictures show the curved backdrop at either end of the section.  The left hand shot is at the Down staging yards and the right hand shot is leading to the helix.

 

fixing backdrop in place

The shot above shows the second section of backdrop being held in place with clamps and pieces of 2×1 whilst the adhesive sets.  The clamps were left in place for 24 hours.  I used construction adhesive, and was planning on using only that, but have since decided to also screw the MDF to the supports at the top and bottom.  These screws will pretty much be hidden behind scenery and the upper deck pelmet.

 

Panorama view of Temple Court section

The shot above is a panorama view of the Temple Court backdrop as it is now.  I have started to fill and sand the joins in the MDF.  Next stage will be to paint this in a “sky” blue.

Cheers for now.