Kankool frame installation – Part II …
Hi all,
I’ve done some more installation of the Wire-in-tube (WIT) system for points and signals at Kankool.
Some timber bases were made to fix the WIT hardware to underneath the spline at the Willow Tree end of Kankool loop.
These have been made adjustable to allow for final tweaks when the turnout throwbars are installed.
The photo below shows the mounting block for the WIT signal hardware for the two Down starters on the left hand side, as well as the mounting block for the WIT point hardware for the runaway turnout in the loop and the mainline catchpoint.
The next photo shows a shot from underneath the spline of the mounting block for the Up Home Main & Loop bracket signal and the mainline turnout to the loop.
The next photo shows a shot above the turnout complex at the Willow Tree end. The loop of WIT that can be seen is to connect both mainline and runaway points to a single cable (lever #7).
This now completes the WIT installation for the Willow Tree end of Kankool. Scenery installation can now commence in this area.
Cheers.
Posted on Jun 21, 2016, in Kankool, Signalling, Trackwork and tagged kankool, signals, turnouts, wire-in-tube. Bookmark the permalink. Leave a comment.
Leave a comment
Comments 0